Implementation guide

ISO 19650-2: Delivery phase of assets

Specifies the requirements for managing information during the design and construction (delivery) phase of a built asset, from appointment through to handover.

Published 2018Revision in progress
ISO 19650-2 delivery phase of assets: simple line illustration

Key points

  • Sets out a step by step information management process covering assessment and need, invitation to tender, tender response, appointment, mobilisation, collaborative production, information model delivery and project close out.
  • Requires the appointing party to set clear information requirements, an information standard, production methods and a CDE before appointments are made.
  • Requires delivery teams to respond with a BIM execution plan and to plan deliverables through task and master information delivery plans (TIDP and MIDP).
  • Uses a responsibility matrix to show who produces which information and when.
  • Information is checked, reviewed and approved before it is shared or published in the CDE.
  • Applies to assets of any type and organisations of any size, whatever the procurement strategy.
  • Contains 'shall' requirements, so it is the part most often used for audits and verification schemes.

How it fits with the other standards

Implements the concepts in ISO 19650-1. Information exchanges within it are detailed by ISO 19650-4; security by ISO 19650-5; health and safety information by ISO 19650-6. Level of information need follows ISO 7817-1. Its outputs feed the asset information model used under ISO 19650-3 and asset management under ISO 55001.

Developed by ISO technical committee ISO/TC 59/SC 13.

Questions

Is ISO 19650-2 mandatory in the UK?

It is not law. Use is usually required by the client through contracts and appointments, and many public bodies ask for it.

What is the difference between a pre-appointment and post-appointment BIM execution plan?

The pre-appointment plan forms part of the tender response; the post-appointment plan confirms and details how the appointed team will deliver information once appointed.

What will happen to ISO 19650-2 after the revision?

The draft second edition merges delivery and operational requirements into one whole-life process, replacing both ISO 19650-2:2018 and ISO 19650-3:2020. Until it publishes, the 2018 edition applies.

Does ISO 19650-2 apply to small projects?

Yes. It is designed to be applied proportionately to any size of project.