Key points
- Provides the vocabulary and concepts used across the ISO 19650 series, such as information requirements, information models and the common data environment (CDE).
- Distinguishes organisational, asset, project and exchange information requirements (OIR, AIR, PIR, EIR) and how they feed each other.
- Describes the project information model (PIM) built during delivery and the asset information model (AIM) used in operation.
- Defines the roles of appointing party, lead appointed party and appointed party, and the delivery team structure.
- Explains the CDE as the agreed way to manage information through work in progress, shared, published and archived states.
- Is written as recommendations and guidance rather than auditable requirements; the requirements sit in parts 2 and 3.
- Scales to any asset size or complexity and any procurement route.
How it fits with the other standards
Foundation for ISO 19650-2 to 6. Points to ISO 7817-1 for level of information need and ISO 29481-1 for information delivery manuals. Its asset information concepts connect to asset management under ISO 55000/55001.
Developed by ISO technical committee ISO/TC 59/SC 13.
Questions
Can my organisation be certified to ISO 19650-1?
Part 1 is guidance, so verification schemes normally assess against the requirements in parts 2 and 3 (and part 5 where relevant), using part 1 for the underlying concepts.
Is ISO 19650-1:2018 still valid while the revision is under way?
Yes. The 2018 edition remains current until ISO publishes the second edition.
Does ISO 19650-1 tell us which software to use?
No. It is technology neutral and describes concepts and principles, not products.
What replaced PAS 1192-2 and BS 1192 in the UK?
BS EN ISO 19650-1 and -2, supported by the UK BIM Framework guidance and UK National Annex.